(Definitely not an April Fool, all hands needed!)
Following on from everyone’s efforts last month, we still have to ‘top dress’ the second half of the path we made, using the finer material. This will involve barrowing loads from the bottom end of the path where it will be deposited, then raking etc. It would be really good to get this job done in one go, so the more the merrier……

Meet at the top end of the path (junction with South Common) at 10am armed with barrows, shovels, rakes etc. There will be cake.
At the moment the weather doesn’t look too bad but if that changes we’ll rearrange.
Further info 07799412527 or 07787948264