Proposed Shelloch Windfarm Development

Thornhill and Blair Drummond Community Council have become aware that there is some confusion in the community regarding the proposed windfarm development on the hills behind Kippen.

Force 9 Energy previously had an application for 7 wind turbines, of 125m tip height, consented by the Scottish Government.  This consent has expired.

The current, new, application is for 5 wind turbines, of up to 180m tip height.  These will be visible from Thornhill. (For comparison, Wallace Monument is 67m tall.) The montage below, taken from the developer’s application, illustrates how these might look from Port of Menteith (this is the closest point to Thornhill for which an illustration is provided).

The planning application reference is 20/00840/FUL, and full details of the application can be found on Stirling Council’s Planning Portal using the following link:

https://pabs.stirling.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=QKTN2CPIHTS00

A number of Stirlingshire residents have submitted comments about the proposed development. We suspect that many may have not commented, under the mistaken belief that this development has already received consent.

If you wish to comment, please do so using the above link, no later than 13 February 2021. Comments may also be made to Thornhill and Blair Drummond Community Council at ThornhillBlairdrummondCC@gmail.com for inclusion in our community response to the proposal.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.